Content Calendar — Track-Only · Small Team
DELIVERY NOTE
Delivery Note — Content Calendar (Track-Only)
Contract: OUT-2026-CC-TRACK-SM Build: cc-track-sm-20260623 Delivery date: 2026-06-23 Status: CERTIFIED · FUNCTIONAL_DELIVERED
What Was Delivered
- Content Planning Web Application — shared backlog, editorial calendar, scheduling, status workflow
- Idea Backlog — capture ideas with title + channel/campaign/content type tags
- Editorial Calendar — week and month views with date navigation
- Post Scheduler — assign publish date/time; track-only (no auto-publish)
- Status Workflow — Idea → Scheduled → Published
- This Week View — at-a-glance current week schedule
- Shared Team Workspace — all team members see the same data
- Delivery package — documentation, verification report, assumptions register
What Was Not Delivered (By Design)
- Automatic publishing to social platforms
- OAuth / channel connections
- Approval queues or role-based permissions
- CRM, analytics, or enterprise features
See assumptions.json and outcome-contract.md for full scope.
Verification Summary
6/6 MUST_PASS · 1/1 SHOULD_PASS · 8/8 success criteria covered
| Scenario | Result |
|---|---|
| V-1 Idea Capture | PASS |
| V-2 Schedule on Calendar | PASS |
| V-3 Weekly Planning | PASS |
| V-4 Mark Published | PASS |
| V-5 Team Sharing | PASS |
| V-6 No Auto-Publish | PASS |
| V-7 Status Filter | PASS |
See verification-report.md for full evidence.
Customer Next Steps
- Run locally per
run-deploy-instructions.md - Enter team member names so actions are attributed
- Capture ideas, schedule on calendar, publish manually on your channels
- Mark items Published after manual posting
- Deploy
app/to your server for team access
Handoff
This package is self-contained. Requires Node.js 18+ for the shared data server.