Starship Build Line Planner
Ship Vehicle Assembly · Lean Build Engineering
Notional model — not SpaceX data
Demand (vehicles / day)
Shifts / day
Hours / shift
Weld Cpk acceptance bar
—
Takt (min/veh)
—
Stations
—
Line efficiency
—
Throughput (veh/day)
—
Lead time (h)
Line balance — work-instruction skeleton
Critical path — build lead time
Weld acceptance — process capability
Weld
Cp
Cpk
PPM
Status
Fit stack-ups & DFM
Stack
Nominal
WC ±
RSS ±
Fit
DFM redesign
Parts
Part ↓
Assy ↓
All figures computed live in your browser from the notional model. Reproduce on the CLI with
node run.mjs
and verify with
node verify.mjs
(18 checks).