Starship Build Line Planner

Ship Vehicle Assembly · Lean Build Engineering
Notional model — not SpaceX data
Takt (min/veh)
Stations
Line efficiency
Throughput (veh/day)
Lead time (h)

Line balance — work-instruction skeleton

Critical path — build lead time

Weld acceptance — process capability

WeldCpCpkPPMStatus

Fit stack-ups & DFM

StackNominalWC ±RSS ±Fit
DFM redesignPartsPart ↓Assy ↓
All figures computed live in your browser from the notional model. Reproduce on the CLI with node run.mjs and verify with node verify.mjs (18 checks).